A summary of maintenance and other jobs. Details of all of these jobs are set out on the main diary pages.
Click on the month to go to that diary page, or on the date to go to individual articles.
April 03 Bought car
Radiator cap pressure on overflow � swapped over
Hammerite outriggers
May 03 Hammerite other side of chassis and petrol tank cradle
Unblock boot drainage tubes
Replace front discs and pads
MOT Test
June 03 Drain and refill cooling system, spark plugs replaced
Clean and lubricate o/s window motor
Adjust valves & renew rocker gaskets
Clean ISCV
Clean all engine electrical connectors
July 03 Breakdown repaired with polo mint wrapper. Later (Aug 3), ignition connector block replaced
August 03 Self-cancelling indicators disabled
Bought personal registration
Waterproof roof with Thompson�s
New carpets fitted
Interior cleaned
Reg no plates replaced
Callander Classic car show
Glove box catch fixed
Clean and polish rear alloy strip
Sept 03 Realign driver�s door
Remove wood effect from door trims and polish alloy
Replace aerial
Reset hydraulic tappets (see June 21)
Strip and polish wheels
Oct 03 Finish polishing wheels
Paint front suspension and brake calipers
Repaired broken bonnet hinge. Replaced wheel nuts
Nov 03 Replace number plate light
Dec 03 Replace radio
Car boiling over. Bleed and refill radiator
Jan 04 Car still boiling over. Fit fan over-ride switch.
March 04 Paint wheel drums, drive shafts and petrol tank
Wheels refurbished
April 04 Bleed clutch
Strip and renew rear brakes
Fit bonnet gas strut
Radiator recore
May 04 Hammerite chassis radiator mountings etc
Order front indicator
MOT test
Replace handbrake lever and gear knob
Tidy up dash wood trim
Replace front indicator and finish dash trim
Borders Bash
June 04 Realign bonnet
Change oil and filter
3 stage Meguiars polish
July 04 Order decat downpipes
Clean and paint rear trailing arms. Find hole in o/s one.
Trailing arm plated
Fit decat pipes
Repair n/s window motor again
August 04 Send wheels away for second refurb
Remove and clear out boot drain pipes properly
Refit refurbed wheels. Add fuel cleaner
Repaint second trailing arm. Clean and refit cooling fan
3 stage Meguiars polish
Replace metal battery clip with ratchet strap
Callander Classic
Sept 04 Replace n/s brake caliper
Replace door speakers
Oct 04 Replace throttle potentiometer
Clean ISCV. Realign bonnet catch and jam bonnet. Repair manifold pin holes
Replace ISCV
Dec 04 Turn boot seal so that join is at front
Dehumidifier to dry carpets
Try to seal boot leak
Jan 05 Hood cover scratches paint in windy weather
Hammerite front outriggers
Feb 05 Hammerite front of chassis
March 05 Paint battery tray, rocker covers, exhaust manifolds
Rocker covers replaced. Interior door handle repaired.
Seal water leak in bulkhead
April 05 Wire brush and repaint outriggers
Order distributor cap, rotor arm and leads
Fit new roof catches
Polish and lacquer rocker covers
Fit new dist cap and rotor arm to fix wet weather misfire
Clean and waterproof the roof with Autoglym kit. Replace spark plugs. Finish polishing rocker covers
May 05 Make OBD diagnostic tester
MOT Test
Fitted shiny rocker covers
Refit nearside wheel arch
Brazed exhaust manifold crack
Seal windscreen edge with silicone
June 05 Replace ignition leads to fix wet weather misfire
Repair scratches from hood cover
Clean fuel pump connectors to fix wet weather misfire
Replace fuel filter
Replace rear brake hoses with stainless
Replace disintegrated front brake pad
Front brake hoses have �wrong� connectors. replace with copper pipes and bleed
July 05 Replace front shocks and springs
Adjust drivers door
Re-brazed exhaust crack after grounding
Install exhaust bandage. Break bonnet by crashing into my other car
August 05 Repair estimate. Order new bonnet
Buy new fog lamps
Sept 05 Collect car from bodyshop
Clean and waterproof roof (Thompson�s)
Replace bumper chrome trim. Clean rear window (Renovo)
Oct 05 Bandage exhaust manifold
Floor carpets damp � search for leak
Reseal windscreen edges with tape
Nov 05 Roof still leaking
Dec 05 Replace headlight bulbs
Clean front light connectors. Clean rear foglamp relay.
4 tyres replaced
Jan 06 Replace fan belt
Paint blisters on bonnet
Rebraze exhaust manifold crack
Fill exhaust cracks with metal paste
Feb 06 Car to paintshop
Collect car from paintshop
Start to store car in rented garage. Repair exhaust downpipe connections
Replace crankshaft front oil seal
March 06 Service car. Spot star crazing on bonnet
Car to paintshop
Collect car from paintshop
Finish service
April 06 Adjust drivers door. Radiator top hose leaking
Radiator stub repaired
Reinstall radiator. Install fire extinguisher. Paint spare rocker covers
Install electronic rustproofer gadget
Waterproof roof (Thompson�s)
Clay bar and 3 stage polish
Start to strip and polish wheels
Doune hill climb
May 06 Adjust headlamps
MOT test
Bonnet loose
Replace rocker covers. Repair exhaust downpipes.
Clean and polish alternator
Borders run
Repair front indicator temporarily
June 06 Thirlestane show
Fireseal exhaust manifold. Replace carpet backing
Doune hill climb
Refit interior mirror. Stick on bonnet pads. Rubber trim on rear of bonnet
Glass boot drainage pipe back in
July 06 Make wheelarch extensions
Scottish classic speedfair
August 06 Culzean Classic show
Install Kia front indicators
Front bumpers fitted properly
Callander Classic show
Sept 06 Order exhaust manifolds
Fit upper seat belt mounting adapters
Replace gear lever and handbrake gaiters
Start to replace exhaust manifolds. Diagnose leaking water pump
Remove water pump.
Oct 06 Install new water pump
Finish removing old manifolds & install new manifolds. Notice cat replacement pipes now too short.
Decat pipes lengthened by 10mm.
Exhaust manifold and downpipe replacement complete.
Seal downpipe joints. Replace bonnet gas strut.
Fix leaking radiator bleed screw.
Dec 06 Replace n/s front top balljoint
Jan 07 Battery replaced. Paint cylinder heads
Repair downpipe joints. Paint front hubs and carriers.
Feb 07 Strip front suspension
Hammerite front suspension. Polish front wheels.
March 07 Replace front wheels. Polish rear wheels.
Rallye in the Park. Covered car in mud and broke o/s rear trailing arm.
Diagnose broken trailing arm.
April 07 Remove rear trailing arm
Remove bush from trailing arm.
Strip and repaint rear shocks. Paint o/s rear chassis etc.
Rebuild rear shocks and springs
Trailing arm replaced
Make chassis cleaning tools
Strip and free n/s caliper. Realign n/s wheel arch. Clean muck & stones off outrigger tubes
May 07 MOT Test. Strip and clean earth for o/s rear lamps.
Strip n/s rear chassis, trailing arm etc
Strip n/s outrigger
Paint n/s chassis, outrigger & trailing arm.
Clean and waterproof hood with Autoglym kit.
Renovo rear window
June 07 Thirlestane classic car show with Sporting Bears
Change spark plugs
Strip and paint o/s outrigger
Waxoyl main chassis rails, outriggers, suspension and trailing arms.
Start fibreglass repair to nearside wheelarch.
July 07 Fill wheelarch screw holes in body.
Change oil and filter, paint brake calipers, refit front wheelarches, fibreglass and paint front bits, paint rear wheelarches, tighten bonnet hinge.
Meguiars 3-stage polish.
Polish wheels.
S Club Heaven 2007.
August 07 Irvine Classic Car Show.
Replace headlamps
Fit waterproof wiring connectors to front lights
Callander classic car show
Sept 07 Selkirk Car Show.
Fit waterproof connector to radiator fan, fit new headlamp rings
Oct 07 Realign headlamps
Remove radiator swirl pot
Remove radiator expansion bottle. Remove steering column
repair steering UJ, repaint swirl pot
Remove exhaust.
replace steering column bearing. Refit swirl pot.
Nov 07 Refit radiator expansion tank. Start to clean up petrol tank cradle.
Fit new springs. Paint petrol tank cradle.
Degrease rear chassis rails. Paint sump, petrol tank and drive shafts
Waxoyl rear chassis and petrol tank cradle. Change brake fluid.
Dec 07 Strip clean and grease front brake calipers. Refit exhaust.
January 08 Adjust shock absorbers
Seal steering column bearing. Change boot badge.
February 08 Polish front wheels
Start faffing about with replacement mirrors
March 08 Replace roof stays
Reseal windscreen. Tidy engine wiring.
April 08 Replace mirror covers
Clay bar paintwork.
Clean, polish and wax paintwork.
May 08 Change front wheel bearing
June 08 Thirlestane Classic Car Show
S Club 2008
Change steering column Universal Joint
Change spark plugs
July 08 Fit new fuel sender, repair boot lip leak
August 08 Change oil again, replace front brake disks
Injector Cleaner
Culzean Autoclassica
Sept 08 Car show
Oct 08 Cheque Presentation to School
Dec 08 Reseal windscreen with "Creeping Crack Cure"
January 09 Seal water leak around clutch / brake reservoirs
Seal water leak around bulkhead
Seal water leak around wiper spindle
Sept 09 Replace drivers door mirror glass
March 10 Service
Cut through mounting bolts to remove front dampers
Replace dampers and broken front spring
Finish service - replace fuel filter, clean air filter
May 10 Repair bonnet hinge mounting
Weld bonnet hinge mounting
Re-seal nearside manigold gasket
June 10 Replace coolant temp sensor
July 10 Find rust hole in nearside outrigger
August 10 Start body lift for chassis repair - jack car up
Body disconnected and ready for lifting. Order new bolts
Lift body off chassis! Inspect damage, start wire brushing outriggers
Remove rear suspension units
Start cutting rusty tubes out of chassis, & welding up new bits
Sept 10 Chassis welding finished!
Start painting repaired chassis
Chassis painting finished, replace front shock absorbers
Start replacing body on chassis
Oct 10 Finish putting car back together
Nov 10 Remove seats for re-finishing
Start to recolour and refinish seats
Refinished seats fitted to car
Dec 10 Replace front brake disks and offside caliper
April 11 Clean engine electrical connections
Repaint radiator
Paint cylinder heads
May 11 Clean ISCV and replace gasket
Clean throttle butterflies etc
Fit new plug leads, distributor cap and rotor arm.
Start to reseal windscreen
Start to recolour console, remove exhaust & handbrake
Refit handbrake and console
Oct 11 Start to strip out interior
Replace wood effect on dash panels
Remove old carpets
Start to install new carpets
Nov 11 Finish replacing carpets
Replace brake servo and master cylinder
Dec 11 Replace rear tyres
February 12 Strip and repaint front suspension wishbones
Replace front brake hoses
March 12 Repair broken throttle cable
May 12 Steering column universal joints
July 12 Adjust bonnet
Nov 12 Replace fuel tank cradle
Replace differential rear mounting
January 13 Diagnose and replace fuel pump
Strip and repaint trailing arm
March 13
Remove bonnet
Remove radiator
Strip and repaint front of chassis
May 13 Replace bonnet
June 13
Tour of the Highlands!
Nov 13 Take car to car tuning clinic
remove air intake, fuel rail
clean up rocker covers, alternator
Dec 13 Strip fuel rail
paint alternator bracket, replace injectors, rebuild fuel rail, refit distributor, plenum & rocker covers
refit ISCV, fuel regulator, coolant pipes
January 14 Make smoke tester
smoke test, dismantle top of engine again
reassemble top of engine and smoke test
February 14 Replace lambda sensors
March 14 Make Mk2 Smoke tester
May 14 remove steering rack, repair steering column
June 14 refit steering rack, repair steering column
repair passenger window motor
April 15 repair roof panels
May 15 repair steering column bush
April 16 re-line roof panels again
June 17 Replace front brake disks and pads
Oct 17 Replace diff mount
May 18 Replace front wheel bearing
Sept 18 Repair passenger door lock
May 19 Replace front offside upper balljoint
Sept 19 Take car for chassis refurb
Nov 19 Collect car
Lower ride height
Replace coolant sensor, fit fire extinguisher
Dec 19 Clean seats, paint piping
Feb 20 Replace brake fluid
March 20 Take car to bodyshop for bonnet crack
Collect from bodyshop, repair passenger door handle
Change oil and filter
April 20 Steering Wheel
June 20 Change Fuel Hoses
Replace brake shoes and handbrake cable
July 21 Remove fresh air hoses
March 22 Oil change and service
May 22 Fit Subaru power steering - buy and prepare parts
June 22 Finish Subaru power steering install
Nov 22 Refurbish seats
April 23 Oil change and service, replace fuel filter
July 23 Fix rear light earth
Oct 23 Replace fuel pump relay
Jan 24 Change Fuel Pump
Paint brake servo
Replace fuel hose from tank
Change oil and filter, top up diff oil
Clean up drivers door lock
Refurb both front brake calipers
Feb 24 Change oil again, top up gearbox oil
Adjust handbrake, tighten exhaust hockey stick
Repair driver door mirror
Replace brake master cylinder
Nov 24 check clutch slave cylinder
Remove gearbox
Replace clutch
[home] |